Our Project's

Discover our extensive portfolio of road, highway, and bridge projects in India. As a leading design and project management consultancy, we’ve shaped resilient infrastructure, connected communities, and enabled economic growth. Explore our commitment to excellence and innovation as we build a brighter future for India’s transportation network.

Other Projects

Project Name Project Description Services Client
Nilanga-Latur
Project Management consultancy & Engineering service for Rehabilitation & Up gradation to Two/Four lane with paved shoulder Configuration of NH-65- Jahirabad-Virur-(NH50)-Bhalki(NH52) Nilanga-Nitur-Latur From Km. 00/000 to Km. 64/936 (Design Chainage) in the State of Maharashtra.
Project Management & Design Consultancy
NHAI
Ausa-chakur
Consultancy work for post bid Highway design & Field Investigation (for Topographical survey work) for Widening/strengthening/Upgradation to Four Laning of Ausa-chakur-Loha-Waranga of NH-361 from Km. 58.835 to Km. 244.369 (Existing Chainage: Km 470.000 to Km 611.920) under NH (0) on Hybrid Annuity Mode in the State of Maharashtra.
Topography Survey Consultancy
NHAI
Sanchore- Dhanera
Topography survey for Up gradation 0f NH-168A(Sanchore- Dhanera-Deesa Road )from Km. 0+000 to Km. 11+800 in the state of Rajasthan to two lane with paved shoulder configuration on EPC Mode.
Topography Survey Consultancy
NHAI
AU 114
[AU 114]-Improvement To Road Joining Dist. Border (Yeldari) To Shengaon- Sawna- Mop To Khanergoan Road Km. 0/000 To 57/694 (SH 248).
Safety consultancy
STATE PWD
AU 105
[AU 105]-Construction Of Two Lane Road With Paved Shoulders From District Border Loha – Kandhar – Mukhed – Eklara – Khanapur – Narnagal -Sagroli- Biloli – Kundalwadi – Dharmabad To State Border Msh-16 & Sh – 268 Dist. Nanded Under Hybrid Annuity (Msh-16 From Khanapurphata km 371/900 To Kundalwadi Km 419/000 And Sh- 268 From Kundalwadi Km 67/300 To State Border Km 89/000)].
Safety consultancy
STATE PWD
AU 107
[AU 107]-Construction Of Two Lane Road With Paved Shoulders From Hadgaon- Tamsa BhokarUmrikaregaon- Lohogaon, State Highway No.-251, Chainage 00/000 To 89/000 On Hybrid Annuity.
Safety consultancy
STATE PWD
AU 108
[AU 108]-Construction Of Two Laning Road With Paved Shoulders District Border To Chuncha Manatha Sawargaon Barad Mudkhed Gadga Khandgaon Mukhed Sawargaon(BK) Jamb Road (Part: – Chuncha To Mudkhed Km. 0/00 To 48/700) in Nanded Dist.
Safety consultancy
STATE PWD
AU 110
[AU 110]-Improvement To – Road 1: – Sonpeth-Tadkalas-Palammardasgaon- Banwas To Dist. Border (Sh-235), From Sonpeth Km. 51/100 To Umra Phata Km 97/606 & Road 2: – Pachlegaon-Niwali (Kh.)- Walur Rajewadi To Sh-253 (Mdr- 30) From Balasa Phata Km.0/000 To Rajewadi Km 33/074 Dist. – Parbhani In The State Of Maharashtra.
Safety consultancy
STATE PWD
AU 102
[AU 102]- Upgradation of state highways to Two lane with/without paved shoulder configuration on Hybrid Annuity improvement to Jalna-londyachi wadi- Gade Sawargaon -Ghanasavangi-road (including Jalna bypass) SH-26.
Design Consultancy
STATE PWD
AU 115
HAM-AU-115 -Construction of two laning road with paved shoulders (Dist. Border (Patonda) SirsamBasamba (KM14/092 to KM 44/326) of Hingoli-Aundha (Nagnath)-Wangewadi-Nageshwarwadi-Hatta to NH61 road KM 44/236 to 97/225) (SH249).
Design Consultancy
STATE PWD
AU 116
HAM-AU-116- Construction of two laning with paved shoulders Dist. Hingoli (Kalamnuri-Sodegaon-BoldaKurunda-Vasmat to Dist Border (Alegaon) KM 0/00 to 61/775 (SH 256).
Design Consultancy
STATE PWD
AU 109
HAM-AU-109- Construction of two laning road with paved shoulders Dist. Border to Chuncha–ManathaSwargaon-Barad-Mudkhed-Gadga-Khandgaon Mukhed Sawargaon BK Jam Road KM 48/700 to 97/951 in Nanded Dist.
Design Consultancy
STATE PWD
AU 100B
AU 100B- Upgradation of State Highways to two lane with/without paved shoulder configuration on hybrid annuity improvement to Hasta – Pishor Bharadi – Sillod- Road SH-5
Design Consultancy
STATE PWD
Kusumba Malegaon
[Kusumba Malegaon- Upgradation of Kusumba to Malegaon section of principally approved NH from Ch: 55+000 Km to Ch: 96+410 Km (Design Ch.54+155 Km to Ch:95+500,Total Length 41.345 km) to two lane with paved shoulder configuration(Package No.Nashik-II Dondaicha-Kusumba-Dongarle-Malegaon Road Approx.96.00 Km)in the state Maharashtra on EPC mode-Package 2(Nashik Division).
Design Consultancy
STATE PWD
NSK 70A
NSK-70A- Construction of 2 laning with paved shoulders road of Karjat- Bhigwan Road section of SH-54 from Km 92/500 to Km 128/100 in district Ahmednagar in the state of Maharashtra under MRIP on Hybrid Annuity Mode.
Design Consultancy
STATE PWD
NSK 70B
NSK-70B- Improvement of MSH 8 to Ghoghargaon to Kombhali Walwad Karjat MDR-66 Km 0/0 to 29/800 Dist. Ahmednagar (Ghoghargaon to Karjat) in the State of Maharashtra on Hybrid Annuity Mode.
Design Consultancy
STATE PWD
Chuncha to Sawargaon
HAM-AU-109- Construction of two laning road with paved shoulders Dist. Border to Chuncha–ManathaSwargaon-Barad-Mudkhed-Gadga-Khandgaon Mukhed Sawargaon BK Jam Road KM 48/700 to 97/951 in Nanded Dist.
Design Consultancy
STATE PWD
Omerga – Ausa
Omerga – Ausa- Upgradation of Omerga to Ausa Section of NH- 548 B from km 249/200 to km 201/400 to two lanes with paved shoulder configuration [Omerga-Ausa-Latur-Renapur-Pangaon-Dharmapuri-ParaliInjegaon road design chainage km 0/00 (Omerga) to km. 47/800 (Ausa) (length-47.80 km)] in the State of Maharashtra on EPC mode under NH(O).
Design Consultancy
NHAI
Shendra – Bidkin Industrial area
Infrastructure work for roads, drains, culverts, minor bridges, water supply, sewerage and power systems for Phase – I in Shendra – Bidkin Industrial area, Aurangabad (AITL) under Delhi Mumbai Industrial corridor (DMIC).
Design Consultancy
SPL