Innovision

Download

Savali Vihir-Ahmednagar Project Synopsis

Up-gradation to 4-Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length – 75.000 km) section of NH-160 in the State of Maharashtra.

Balaghat-Gondia Project Synopsis

Construction of 4 lane divided carriageway with paved shoulder from Km 0+000 to Km 41+210 (Balaghat-Gondia section) of NH-543 (Design Length 41.210 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra.